http://www.pwcforum.com
Go Back   PWC Forum: The best hang-out for Personal WaterCraft enthusiasts

Please Visit our Site Sponsors


» Sponsors
» Sponsors
Thread: hourly re-build
View Single Post
Old 04-28-2008, 10:22 AM   #1 (permalink)
charazin22
Junior Member
 
Join Date: Apr 2008
Posts: 28
Default hourly re-build

I was just wondering how many hours you should run a ski before re-build, and if you need to do the top and bottom or just the top. i bought my gpr with 83 hours on it and it now has 101.3. It still screams and has good compression but better safe than sorry right?
charazin22 is offline   Reply With Quote
 
Powered by vBadvanced CMPS v3.0 RC2
Powered by vBulletin® Version 3.6.8
Copyright ©2000 - 2009, Jelsoft Enterprises Ltd.