http://www.pwcforum.com
Go Back   PWC Forum: The best hang-out for Personal WaterCraft enthusiasts

Please Visit our Site Sponsors


» Sponsors
» Sponsors
Thread: hourly re-build
View Single Post
Old 05-12-2008, 03:28 AM   #16 (permalink)
samson77
Junior Member
 
Join Date: May 2008
Posts: 7
Default

Charazin, I did the D plate replacement on my 2000 GP1200R, and it took a total of about 3 hours (I had no previous waverunner experience, only cars). The D plate I bought comes with a little clip to fool the system into delivering more fuel (remy do I have that backwards?) so you dont have to worry. When I took my cat/con out it was in several pieces, causing the engine to overheat.
samson77 is offline   Reply With Quote
 
Powered by vBadvanced CMPS v3.0 RC2
Powered by vBulletin® Version 3.6.8
Copyright ©2000 - 2009, Jelsoft Enterprises Ltd.